Description
RTD SENSOR PT100 OHMS TC17896 VOLTON THREADS 1/4-28 24in LONG LEADS (3) @ 0°C = 100.00±0.12 OHMS UP TO 500°C
Error: Contact form not found.
Error: Contact form not found.
Error: Contact form not found.

RTD SENSOR PT100 OHMS TC17896 VOLTON THREADS 1/4-28 24in LONG LEADS (3) @ 0°C = 100.00±0.12 OHMS UP TO 500°C
RTD SENSOR PT100 OHMS TC17896 VOLTON THREADS 1/4-28 24in LONG LEADS (3) @ 0°C = 100.00±0.12 OHMS UP TO 500°C